TechMitram Agritech · HTC Setup & Consultation · Agri-processing, Western India

HTC plant setup turns waste disposal cost into a revenue stream

Challenge

A mid-sized agri-processing facility was paying steadily rising fees to dispose of wet organic waste, with no plan for the volumes it expected as production scaled.

Approach

TechMitram ran a feasibility consultation on the facility's waste stream, sized an HTC plant to expected volumes, and proposed a phased setup to de-risk the initial capital outlay.

Execution

Our team managed procurement, installation, and commissioning of the HTC plant over a 14-week program, including operator training for the client's on-site team.

Results

Waste disposal costs were eliminated and replaced with a saleable hydrochar output, with the plant reaching target throughput within 6 weeks of commissioning.

Impact

The facility now treats a former cost center as a value-generating process, and the model is being evaluated for a second site.